TENDER DOCUMENTS
Posted by Michael Jepp in on October 17, 2019

A detailed drawing package is prepared so that each contractor is fully informed of their role before the project starts.
Posted by Michael Jepp in on October 17, 2019
A detailed drawing package is prepared so that each contractor is fully informed of their role before the project starts.